Welcome to OUFEIYAJU Official website!

OUFEIYAJU

- Building materials -
WITH HEART  WITH LOVE

HOTLINE:15052442715

Mobile garbage room


Design requirements:
1. A simple rain shed should be installed at the entrance and exit of the mobile garbage room to prevent rainwater from eroding the garbage and causing pollution.
2. Building height: should not be less than 2 meters. Set separately, the steel structure mobile type is preferred.
3. Organized drainage is adopted, and the drainage standpipe is arranged in a hidden place.
4. It is recommended to install more than two windows for ventilation windows, 1 meter above the ground.
5. The mobile garbage room must be equipped with a splash-proof socket, a switch (near the entrance), and a waterproof ceiling lamp on the ceiling.
6. It is recommended to set up a dry area and a wet area in the mobile garbage room to prevent mutual contamination of leakage liquid.